本文从总承包商的立场出发,重点分析科研办公楼项目在施工阶段中的造价控制工作。针对该项目在工期一定的情况下,怎么做到在钢筋工程、混凝土工程、模板工程这三大工程中,使人力、物力达到最大的使用率,节约人力、材料资源,把线性规划法应用到科研办公楼项目中,对项目的成本进行监督、对比和分析,实现对造价的有效控制这一目标。

From the standpoint of the general contractor, this paper analyzes the cost control of scientific research office building in the construction stage.. For the project in a certain condition of time limit, how to do in the project of reinforcement engineering, concrete engineering, template engineering, human and material resources reach the maximum use rate, saves the manpower, the material resources, the linear programming method is applied to the office building of scientific research project, the cost of the project supervision, analysis and comparison, achieve the aim of effective control of cost.